If you are dealing with regularization documentation support for a residential property, this guide sets out the legal position, the documents you will need, the usual steps and the mistakes that cost people time. The firm of Advocate B.K. Singh handles this work from offices in Dwarka, New Delhi and Vaishali, Ghaziabad.
In short. Regularisation is the process by which a municipal body or development authority accepts something built, used or transferred without proper approval, usually on payment of charges. Documentation support means assembling the title chain, plans, structural certificates, affidavits and fee proofs the authority demands, in the form it accepts. Some deviations can be compounded; others must be removed.
Regularisation is what people seek when a property does not fully match the rules: an extra floor built beyond the sanctioned plan, a plot in an unauthorised colony held on a GPA and agreement to sell, a basement used for a shop, a farmhouse on agricultural land, an industrial unit in a non-conforming area, or a transfer that the authority never recorded. The authority concerned, which may be MCD, DDA, the Noida or Greater Noida authority, GDA, HSVP or the Haryana Department of Town and Country Planning, can accept certain irregularities on payment and conditions. It cannot accept everything.
Most regularisation files fail on paper rather than on law. The application is filed without the title chain the authority wants, the architect's drawing does not match the site, the structural safety certificate is missing, or an affidavit says something that contradicts an earlier document. This article explains the kinds of regularisation available in Delhi NCR, the documents each needs, how the process runs, what cannot be regularised, and how the answer changes with the property and the party.
- Law
- Delhi Municipal Corporation Act 1957 and Unified Building Bye-Laws for Delhi 2016; NCT of Delhi (Recognition of Property Rights of Residents in Unauthorised Colonies) Act 2019 and DDA Regulations 2019; UP Urban Planning and Development Act 1973; UP Industrial Area Development Act 1976; Haryana Development and Regulation of Urban Areas Act 1975; Punjab Scheduled Roads and Controlled Areas Act 1963; Haryana Building Code 2017; UP Revenue Code 2006 s.80
- Authority
- MCD, NDMC or DDA in Delhi; Noida, Greater Noida, YEIDA and GDA in UP; DTCP, HSVP and municipal corporations in Haryana; SDM for land use declarations in UP
- Time limit
- Set by each scheme or notice; replies to show cause, sealing or demolition notices usually within days; protection for unauthorised development in Delhi under the Special Provisions Act currently runs to 31 December 2026
- Documents
- Title chain, possession proof, sanctioned plan, as-built drawing by a registered architect, structural safety certificate, photographs, tax and utility bills, affidavits, indemnity and undertaking, NOCs, fee receipts
What regularisation means and what documentation support covers
Regularisation means getting the competent authority to accept, on record, a construction, use, sub-division or transfer that did not have the required approval when it was done. The authority does this under a power in its statute, building bye-laws or a notified policy, usually on payment of compounding or regularisation charges and on conditions such as structural safety and no encroachment on public land. Once accepted, the property can be mutated, mortgaged, sold and supplied with services without the irregularity hanging over it.
Documentation support is the legal and paper side of that process. It involves reading the scheme or bye-law to see what can be regularised, checking the title and possession papers, getting the drawings and certificates prepared by qualified professionals, drafting affidavits, undertakings and indemnities that are accurate, filing on the right portal, answering objections and following up until the order is passed. It also involves telling the owner honestly when a deviation is not regularisable, so that money is not wasted on a hopeless application.
Regularisation is not a court process. Civil courts cannot regularise a building, and in Delhi the civil court's jurisdiction over most building matters is barred in favour of the Appellate Tribunal MCD. Lawyers come into regularisation because the documents carry legal consequences: an affidavit admitting a deviation can be used in a demolition case, and an indemnity given carelessly can make the owner liable for a neighbour's claim.
Common kinds of regularisation and what each needs
| Kind of regularisation | Usual authority | Key documents |
|---|---|---|
| Construction beyond sanctioned plan (extra coverage, height, floor) | MCD, NDMC, Noida, GDA, HSVP, municipal corporations | Sanctioned plan, as-built drawing, structural safety certificate, photographs, compounding fee |
| Plot in unauthorised colony in Delhi | DDA under the 2019 Act and PM-UDAY | GPA, agreement to sell, will, possession letter, payment proof, GIS survey, affidavit and indemnity |
| Unauthorised colony in Haryana | DTCP and urban local bodies | Colony survey, layout, owner and plot records, development charges |
| Change of land use or non-agricultural use | DTCP in Haryana, SDM under UP Revenue Code s.80, DDA and MCD in Delhi | Revenue records, site plan, conversion charges, NOCs |
| Basement or mixed use | MCD, Noida authority, GDA | Sanctioned plan, use permitted under the master plan, fire and structural certificates |
| Irregular transfer or GPA chain | DDA, Noida, Greater Noida, GDA, cooperative society registrar | Full chain of GPAs and agreements, receipts, affidavits, indemnity, transfer charges |
| Lal dora or abadi property | Revenue Department and MCD in Delhi | Lal dora certificate, old revenue records, possession proof |
Main laws and policies behind regularisation in Delhi NCR
NCT of Delhi (Recognition of Property Rights of Residents in Unauthorised Colonies) Act 2019
This Act and the DDA Regulations made under it allow residents of identified unauthorised colonies in Delhi to get ownership or transfer rights on the basis of their last transaction documents, such as a GPA, agreement to sell, will, possession letter or payment receipt. The scheme is run through the PM-UDAY portal, with a GIS survey of the plot and a conveyance deed or authorisation slip on payment of charges graded by plot area.
Delhi Municipal Corporation Act 1957 and Unified Building Bye-Laws 2016
MCD can stop work, seal and demolish unauthorised construction, and the bye-laws allow certain deviations to be compounded within limits on payment. Appeals against sealing and demolition orders lie to the Appellate Tribunal MCD, and the civil court's jurisdiction over these matters is barred. The NCT of Delhi Laws (Special Provisions) Second Act 2011, extended most recently to 31 December 2026, protects specified categories of unauthorised development from punitive action while policies are framed, subject to its conditions.
UP Urban Planning and Development Act 1973 and UP Industrial Area Development Act 1976
Development authorities such as GDA work under the 1973 Act, which allows compounding of certain building offences on payment. Noida, Greater Noida and YEIDA work under the 1976 Act and their own building regulations, which provide for compounding of permissible deviations and for penalties and demolition of non-compoundable work.
Haryana Development and Regulation of Urban Areas Act 1975 and Controlled Areas Act 1963
DTCP grants licences for colonies and permission for change of land use in controlled areas. The Haryana Building Code 2017 and the department's compounding policies govern regularisation of building violations, and the Haryana Management of Civic Amenities and Infrastructure Deficient Municipal Areas (Special Provisions) Act 2013 provides for regularisation of colonies lacking civic amenities.
Section 80, UP Revenue Code 2006
A bhumidhar can apply to the SDM for a declaration that land is being used for non-agricultural purposes. The declaration changes the character of the land in the revenue record, with consequences for the forum, stamp duty and the applicable law, and is often the first step before a building plan can be approved on former farmland.
Unauthorised colonies in Delhi: PM-UDAY documentation
For a plot or house in one of Delhi's notified unauthorised colonies, regularisation of ownership happens under the 2019 Act through the PM-UDAY portal. The applicant registers online, uploads the documents of the last transaction in his favour, gets the plot surveyed through the GIS survey, pays the charges worked out on the plot area and circle rate, and then receives a conveyance deed for private land or an authorisation slip for government land, which is registered at the Sub-Registrar.
The documents accepted are the ones people in these colonies actually hold: GPA, agreement to sell, will, possession letter, receipts of payment, and sometimes an affidavit explaining gaps. The DDA checks that the chain ends with the applicant and that the plot is not on land excluded from the scheme, such as certain government, forest or protected land. Mismatches between the name on the GPA and the applicant's identity documents, gaps in the chain, and disputes among heirs of a deceased holder are the usual reasons for objections.
Regularisation of ownership under PM-UDAY is not the same as regularisation of the building. A conveyance deed recognises the right in the plot; it does not approve the building standing on it, and building plans in these colonies are dealt with under separate regulations. Owners should keep both questions separate and not assume that a conveyance deed protects an unsafe or excess structure.
Compounding of building deviations
Compounding means paying a charge to have a deviation from the sanctioned plan accepted, instead of removing it. The bye-laws or regulations specify what can be compounded, usually small excesses in ground coverage, floor area, setbacks or height within a fixed percentage, and internal changes that do not affect structure or safety. They also specify what cannot be compounded, such as construction on public land, encroachment on roads, extra floors beyond the permissible height, construction affecting structural safety, and use not permitted in that zone.
A compounding application needs the sanctioned plan, an as-built drawing prepared by a registered architect showing every deviation in a different colour, a structural safety certificate from a qualified structural engineer, photographs, ownership documents and the fee calculation. In Delhi the application is made to MCD or NDMC, in Noida and Greater Noida to the authority's planning department, in Ghaziabad to GDA, and in Haryana to HSVP, the municipal corporation or DTCP depending on where the plot lies.
Compounding is decided on what is on site, not on what the application says. An inspector visits, and if the drawing understates the deviation, the application is rejected and the admission in it can be used to support demolition. The drawing must be honest. Where part of the deviation is not compoundable, the usual course is to remove that part, get a completion of the removal recorded and compound the rest.
Regularisation before DTCP and in Haryana
In Haryana, DTCP handles licensed colonies, change of land use in controlled areas and regularisation of certain violations, while HSVP handles its own sectors and municipal corporations handle areas within their limits. Regularisation documentation support before DTCP usually involves a CLU or composition application, with the khasra and jamabandi records, a site plan, the building plan, proof of ownership and payment of conversion and composition charges.
For buildings constructed without CLU in a controlled area, the department has from time to time notified policies for composition of the violation on payment, subject to conditions such as road access, minimum area and safety. For colonies, the 2013 Act and later notifications have regularised colonies that meet the criteria, after which individual plot holders deal with the municipal body for building plans and services. Because these policies are notified for limited windows and change often, check the current DTCP notification before preparing a file.
Completion, occupancy and the link to regularisation
A building without a completion or occupancy certificate is irregular even if it was built to plan. Regularisation and completion are therefore often handled together: deviations are compounded or removed, and then a completion or occupancy certificate is applied for. For an individual house, the owner applies; for a group housing project, the builder applies, and buyers depend on the builder to get it done.
Banks, buyers and authorities increasingly ask for the occupancy certificate before a loan, a sale or a transfer is recorded. Our pages on completion certificate assistance and occupancy certificate assistance explain what each needs. Where a builder has deviated from the sanctioned plan in a RERA-registered project, buyers can complain to RERA under the provisions on adherence to sanctioned plans, rather than trying to regularise the deviation themselves.
Change of use and agricultural land
Land recorded as agricultural cannot lawfully be used for a house, shop, resort or factory until its use is changed. In Uttar Pradesh, the first step is a declaration by the SDM under section 80 of the UP Revenue Code that the land is used for non-agricultural purposes; within development areas the authority's master plan and permission also matter. In Haryana, land in controlled areas needs CLU permission from DTCP. In Delhi, agricultural land is governed by the Delhi Land Reforms Act and the Master Plan, and change of use is tightly controlled.
Change of use for an existing building on agricultural land is harder than conversion before construction. The authority will ask for revenue records, possession proof, a site plan showing access, and NOCs from bodies such as the fire department, pollution control board or forest department depending on the use. A land use conversion check before buying farmland for a farmhouse or resort is far cheaper than a regularisation file after building on it.
Lal dora and village abadi property
Property in the lal dora or abadi area of a Delhi village was historically outside building regulations and often has no registered title chain. Regularisation here usually means building up documentation of ownership and possession: a lal dora certificate from the Revenue Department, old revenue entries, house tax and electricity records, a family settlement or partition among heirs, and registered documents for later transfers. Where survey-based property cards have been issued under central or state schemes, they help.
The extended lal dora areas and urbanised villages have their own rules for building plans, and MCD applies the bye-laws as notified for them. A buyer of lal dora property should ask for the full set of documents before paying, and a seller should regularise the paper trail before advertising. Our page on lal dora documentation support covers this in more detail.
How regularisation documentation support works, step by step
The steps below apply to most regularisation files, whichever authority hears them.
Identify the irregularity precisely
Compare the site with the sanctioned plan, the lease, the revenue record and the master plan. Write down every deviation in construction, use, sub-division or transfer, with measurements.
Read the scheme or bye-law that applies
Find the current notification and check what is compoundable, the limits, the charges and the documents demanded. Note any deadline or window for applications.
Check title and possession papers
Confirm that the applicant's title or last transaction document is in order, that heirs are sorted out and that names match identity documents. Fix gaps by affidavit, release or rectification where the law allows.
Get the technical documents prepared
Engage a registered architect for the as-built drawing and a structural engineer for the safety certificate. Check that both match the site and each other before filing.
Draft affidavits, undertakings and indemnities carefully
State facts accurately, avoid admissions beyond what is necessary, and limit indemnities to what the scheme requires. Get them notarised or attested as the authority demands.
File, attend inspection and follow up
File on the portal or at the counter, pay the charges, attend the site inspection and reply to objections in writing within the time given. Collect the regularisation order and update mutation and tax records.
The documents that decide a regularisation file
Three documents decide most files. The first is the as-built drawing: it must show every deviation honestly, be signed by a registered architect and match what the inspector will see. The second is the structural safety certificate: authorities will not compound additional floors or changes without it, and after recent building collapses and basement incidents they read it carefully. The third is the title or last transaction document: if the authority is not satisfied that the applicant has the right to the property, it will not regularise anything.
Affidavits and indemnities come next. Authorities usually ask for an affidavit that the facts are true, an undertaking to remove non-compoundable portions and to abide by conditions, and an indemnity against third-party claims. When Advocate B.K. Singh reviews regularisation papers, he checks that the affidavit does not admit more than the drawing shows, because an affidavit filed in a regularisation application is a public document that can be used in a demolition or sealing case if the application fails.
Support documents complete the file: property tax receipts, electricity and water bills, photographs with dates, NOCs from the society or RWA where the scheme requires, fire NOC for larger buildings, and proof of payment of charges. Keep a numbered index and a copy of everything filed.
Documents usually needed for regularisation
Ownership and possession
- Registered sale deed, conveyance deed or lease from the authority
- For unauthorised colonies: GPA, agreement to sell, will, possession letter and payment receipts
- Mutation order and property tax receipts
- Electricity and water bills; photographs with dates
Technical papers
- Sanctioned building plan, if any
- As-built drawing by a registered architect showing deviations
- Structural safety certificate from a qualified structural engineer
- Site plan, survey or GIS report
Declarations and approvals
- Affidavit of facts and undertaking
- Indemnity bond in the authority's format
- NOCs from society, fire department or other bodies as required
- Proof of payment of regularisation or compounding charges
When regularisation is not possible, and what to do instead
Regularisation is not available for construction on public land, roads, parks or drains, for encroachment on a neighbour's land, for floors beyond the height permitted for the plot, for uses not allowed in the zone, or for anything that makes the building unsafe. In those cases the realistic options are to remove the non-compoundable part, to apply for a change in use if the master plan allows it, or to defend enforcement action on procedural grounds while correcting the building.
If a show cause, stop work, sealing or demolition notice has already been issued, reply within the time given and ask for a personal hearing. A pending regularisation application is a relevant fact but rarely a complete defence, and authorities can act against non-compoundable work even while an application is pending. Our pages on demolition notice response and sealing notice response explain the appeal routes. In Delhi, the appeal lies to the Appellate Tribunal MCD; in UP and Haryana, to the authority or officer the statute names, and then to the High Court in writ.
How regularisation differs by property type
For a flat in a group housing society, individual owners rarely regularise anything themselves; deviations are usually in the project, and the builder or society must deal with them. Internal changes such as enclosing a balcony or merging flats can still be objected to by the authority or society. For a builder floor, the typical issue is an extra floor or stilt parking converted to rooms, and each floor owner's sale deed may need to be checked against the sanctioned plan.
For a basement unit, the question is use. Basements are generally allowed for parking, storage and services, and commercial or residential use of a basement is usually not compoundable. Enforcement against basement misuse in Delhi has become strict since 2024. For an industrial plot, regularisation often concerns extra coverage, change in trade, sub-division or sub-letting, each of which needs the authority's approval under the lease. For a resort or farmhouse, the questions are land use, permitted coverage on agricultural land and environmental clearances. For a shop or commercial unit, the master plan's mixed-use and commercial street provisions decide what can be accepted on payment of conversion charges.
How regularisation differs by party
A bank or NBFC lending against a property will ask whether any construction is unauthorised, and its panel advocate's title report will flag it. Lenders often require regularisation or an undertaking to regularise before disbursement, and an auction purchaser from a bank buys the property with its irregularities, so he must check them before bidding. A buyer should insist that the seller regularises before the sale or that the price reflects the cost and risk.
A builder or developer applies for compounding and completion on behalf of the project and cannot pass on the cost of its own deviations to buyers unless the agreement allows it. A society or RWA may need to give an NOC and can object to deviations affecting common areas. A company or LLP applies through an authorised signatory with a board resolution. An NRI owner can act through a special power of attorney, but site inspections and affidavits need someone who knows the property, so the attorney should be chosen carefully.
What courts can and cannot do
Courts cannot regularise a building or a colony; that is the authority's power under its statute. A civil court can decide title disputes that block regularisation, for example a dispute among heirs over who should apply, and can grant declarations and injunctions between private parties. In Delhi, suits against MCD about sealing and demolition are barred, and the remedy is the Appellate Tribunal MCD. High Courts hear writ petitions where an authority acts without jurisdiction, ignores its own policy or decides without a hearing, and they sometimes direct the authority to decide a pending regularisation application within a time limit.
Expect a writ court to be unsympathetic to clearly illegal construction. Courts in Delhi have repeatedly directed action against unauthorised construction and have warned that pending applications cannot be used as a shield. A case in court should be supported by a genuine regularisation file and a plan to remove what cannot be accepted.
Here's a made-up example: an extra floor and a missing certificate
Here's a made-up example. Anil bought a builder floor in Ghaziabad. When he applied for a home loan top-up, the bank's panel advocate reported that the building had four floors against three sanctioned and no completion certificate. The bank refused further disbursement until the deviation was dealt with.
His lawyer obtained the sanctioned plan from GDA, had an architect prepare an as-built drawing and a structural engineer inspect the building. The structural report confirmed that the fourth floor was safe, and the drawing showed that the extra floor area fell within the limit the authority could compound, while a small projection over the road did not. The owners of all four floors agreed to remove the projection and share the compounding charges.
After the projection was removed and photographed, a compounding application was filed with affidavits from all owners and the structural certificate. The inspector visited, the charges were paid and the compounding order was issued, followed by the completion certificate. The bank resumed the loan. Without the agreement of all floor owners, the file would have stalled at the first objection.
Common mistakes and what to do this week
The usual mistakes are applying without reading the current notification, filing a drawing that understates the deviation, giving an affidavit or indemnity broader than needed, leaving title gaps unresolved, applying under a scheme whose window has closed, and assuming that a pending application stops enforcement. Owners also wait for a notice before acting, when the cheaper and safer course is to regularise before selling, mortgaging or receiving a notice.
This week, collect the sanctioned plan, title papers, tax and utility bills and photographs, and find the scheme or bye-law that applies to your property. Have the title checked through a title verification and get an architect to measure the deviations. After regularisation, update the records through mutation assistance, and where the property is leasehold, consider freehold conversion. If you want the papers checked before you file, the team of Advocate B.K. Singh at Legals365 can review them and tell you the next step: talk to a lawyer.
Residential property: what changes
Residential property covers houses, builder floors, flats in group housing societies and apartments in developer projects. It is the property people care about most, and the law gives it more protection than commercial premises: consumer remedies against builders, rent control for old tenancies, special rules for senior citizens and family members. It also carries more family disputes than any other kind of asset.
The documents depend on the type. For an independent house or builder floor in Delhi, ask for the chain of sale deeds or the conveyance deed from DDA, the sanctioned building plan, the completion certificate, mutation in MCD records, the latest property tax receipt and electricity and water bills. For a flat in a cooperative group housing society, ownership runs through membership: the share certificate, the society's NOC and the Registrar of Cooperative Societies' approval of the transfer matter as much as the deed. For a flat in a developer project in Noida, Greater Noida or Gurugram, check the RERA registration, the builder-buyer agreement, the occupancy certificate, the tripartite sub-lease or conveyance deed, and whether the builder has paid the land dues to the authority, since unpaid dues have held up registration for thousands of buyers.
Stamp duty is charged on the higher of the price and the circle rate. Delhi charges women buyers a lower rate, and joint purchases fall in between; Uttar Pradesh and Haryana have their own concessions. Registration is at the sub-registrar office for the area, with both parties and two witnesses present. After registration, mutation in the municipal or authority record should be applied for, since it governs property tax and later dealings, even though mutation is not proof of title.
Disputes tend to fall into a few groups. Against builders: delayed possession, reduced area, poor construction and missing amenities, which go to the RERA authority or the consumer commission at the buyer's choice. Between landlord and tenant: old tenancies with rent up to ₹3,500 a month in Delhi are governed by the Delhi Rent Control Act 1958, where eviction for the landlord's bona fide need under section 14(1)(e) is the usual route; newer tenancies are contractual and go to the civil court or the rent authority under any new tenancy law the state has adopted. Within families: partition, wills and succession, and disputes over who may live in the house. Senior citizens can approach the Maintenance Tribunal under the Maintenance and Welfare of Parents and Senior Citizens Act 2007, which in appropriate cases has ordered children to vacate a parent's house. A wife's right to reside in the shared household under the Domestic Violence Act 2005 can also affect who stays in a property.
A few habits prevent most problems. Never buy on a GPA and agreement to sell alone. Insist on the occupancy or completion certificate. Keep original documents safe and certified copies handy. And put family arrangements about a house in writing, ideally a registered partition or family settlement, before a death or a marriage breakdown turns them into litigation.
Frequently asked questions
What is regularisation of property?
Regularisation is the acceptance by a municipal body or development authority of a construction, use or transfer that was made without proper approval. It is done under a statute, bye-law or notified policy, usually on payment of charges and conditions. Not every irregularity can be regularised.
Which documents are needed for regularisation of unauthorised construction?
Usually the ownership documents, the sanctioned plan, an as-built drawing by a registered architect, a structural safety certificate, photographs, tax and utility bills, an affidavit, an undertaking and an indemnity, plus proof of payment of compounding charges. The authority's checklist may add NOCs.
Can every unauthorised construction be regularised?
No. Construction on public land, encroachment on roads or a neighbour's land, floors beyond the permitted height, uses not allowed in the zone and anything that makes the building unsafe are generally not compoundable. Those parts must be removed.
How do I get a conveyance deed for a plot in an unauthorised colony in Delhi?
Apply on the PM-UDAY portal under the 2019 Act with your last transaction documents, such as GPA, agreement to sell, will and payment receipts. After the GIS survey and payment of charges, DDA issues a conveyance deed or authorisation slip, which is registered.
Does a PM-UDAY conveyance deed regularise the building?
No. It recognises ownership or transfer rights in the plot. The building on it is dealt with separately under the building regulations for those colonies, so structural safety and permitted construction remain separate questions.
What is compounding of a building violation?
Compounding is paying a charge to have a deviation from the sanctioned plan accepted instead of demolishing it. It is allowed only for deviations within the limits in the bye-laws or regulations, and only after an inspection confirms what is on site.
Can regularisation stop a demolition notice?
A pending application is relevant but usually does not stop action against non-compoundable work. Reply to the notice in time, ask for a hearing and pursue the statutory appeal, in Delhi to the Appellate Tribunal MCD. Remove what cannot be regularised.
Who handles regularisation in Haryana?
DTCP handles licensed colonies, change of land use and composition of certain violations in controlled areas; HSVP handles its sectors; municipal corporations handle buildings within their limits. Check the current DTCP policy, because composition windows open and close by notification.
Can a basement be regularised for commercial use?
Generally no. Basements are permitted for parking, storage and services, and commercial or residential use of a basement is usually not compoundable. Enforcement in Delhi has been strict since 2024, so check the master plan provision before investing.
Can a civil court order regularisation of my property?
No. A civil court cannot regularise construction; that power belongs to the authority. It can decide title disputes between private parties that block an application. In Delhi, suits against MCD sealing and demolition are barred, and the remedy is the Appellate Tribunal MCD.
Will a bank give a loan on a property with unauthorised construction?
Most banks and NBFCs will not lend fully until the deviation is regularised or removed, because their title report flags it. Some accept an undertaking to regularise within a time. An auction purchaser takes the property with its irregularities.
How long does regularisation take?
It depends on the authority, the scheme and objections. A simple compounding file can be decided in a few months after inspection, while PM-UDAY and change of use files can take longer if documents have gaps. Prompt replies to objections shorten the process.
Should I go to RERA or the consumer commission against my builder?
You can choose either, as the Supreme Court held in Newtech Promoters v State of UP (2021), but not both for the same relief. RERA is often quicker for refund or delay interest under section 18; the consumer commission can also award compensation for deficiency in service. The choice depends on the amount, the relief you want and how far the project has progressed.
Can my son be evicted from my house if he harasses me?
In many cases, yes. The Maintenance Tribunal under the Senior Citizens Act 2007 has power to protect a parent's property and life, and courts have upheld eviction orders against children in suitable cases. The parent's ownership of the house and evidence of ill-treatment are the key facts.
Need help with Regularization Documentation Support For Residential Property? Send your papers or a short note of what has happened. An advocate from the team of Advocate B.K. Singh will read it and tell you the next step.